West Bank Hall level crossing

Automatic half-barrier level crossing on the North and East route (ELR DRA1).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 in 4 min · scheduled

Next 30 min

OPEN 04:11–05:18 → 66m
Under the hood
Fri 18 Sep · 04:11
Today Tomorrow

Trains in window

04:15 🚃 4D84 Drax Power StationHull Biomass LP (DBS) Up (NE → SW) sched
04:29 🚃 6B50 Immingham Biomass LP (DBS)Drax Power Station Down (SW → NE) no show
04:42 🚃 6H44 Tyne Coal Terminal GBRfDrax AES Down (SW → NE) no show
🚃Empty stock
now 04:11:50 · 58 avg · 3 in window
live observation: 0 up · 1 down
timetable cif full+upd 2026-09-17..2026-09-19
fetched 02:08:22
trust 34,205 active · 29,867 delays · 3,004 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, West Bank Hall crossing is predicted to be closed for about 44 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:52–00:54, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 19:56–20:56 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

West Bank Hall is a automatic half-barrier crossing (AHB) on the Hensall Jn–Drax PS line (North and East route · ELR DRA1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 120 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.8% of the warnings we could verify came true.

Full accuracy report →

Is this right?