CCTV-monitored manual barrier level crossing on the Anglia route (ELR LTN1).
| 01:07 | 6V84 | 🚛 | IPSWGWF → STKGFHH | → from Parkeston SS GBRF | active |
| 01:19 | 6L81 | 🚛 | AVONHFH → PRKSTNY | ← from Colchester | no show |
| 01:29 | 6L82 | 🚛 | AVONHFH → PRKSTNY | ← from Colchester | no show |
On today’s timetable, Manningtree crossing is predicted to be closed for about 9 h 12 min between 06:00 and 22:00, across roughly 97 closures. The longest single predicted closure is 17 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 8.1 min (00:13–00:21, 3 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:42–07:42 in the morning and around 19:24–20:24 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Manningtree is a cctv-monitored manual barrier crossing (CCTV) on the Colchester–Parkeston SS GBRF line (Anglia route · ELR LTN1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 181 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.
Typical timing error was ±122s (9 in 10 within 179s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.