Signal-box-controlled level crossing on the Anglia route (ELR MAH).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:05 | 🚆 2A12 | Manningtree → Harwich Town Down (W → E) | standing 17 min |
| 10:27 | 🚛 6Y53 | Parkeston S.S. → Ipswich Griffin Wharf Up (E → W) | sched |
On today’s timetable, Mistley Station crossing is predicted to be closed for about 3 h 29 min between 06:00 and 22:00, across roughly 48 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.6 min (08:12–08:18, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:57–07:57 in the morning and around 19:55–20:55 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on a footpath in Mistley, Essex, next to the station.
Mistley Station is a signal-box-controlled crossing (SBCMSL) on the Mistley Down Loop–Parkeston SS GBRF line (Anglia route · ELR MAH). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 395 trains through this crossing.
99.7% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.
Typical timing error was ±35s (9 in 10 within 57s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.