Signal-box-controlled level crossing on the Anglia route (ELR MAH).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 16:47 | 🚆 2A41 | Harwich Town → Manningtree Up (E → W) | +10 min |
| 16:54 | 🚛 6L58 | Tunstead Sdgs (FHH) → Parkeston S.S. Down (W → E) | -1 min |
| 17:00 | 🚛 6A33 | North Walsham GBRF → Harwich Refinery Crls Slvs Down (W → E) | no show |
On today’s timetable, Wrabness Station crossing is predicted to be closed for about 3 h 53 min between 06:00 and 22:00, across roughly 48 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (06:03–06:06, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:52–07:52 in the morning and around 20:38–21:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Wrabness Station is a signal-box-controlled crossing (SBCMSL) on the Mistley–Parkeston SS GBRF line (Anglia route · ELR MAH). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 196 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 90.2% of the warnings we could verify came true.