Signal-box-controlled level crossing on the Anglia route (ELR MAH).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π§ 3S60 | Stowmarket DGL β Stowmarket DGL Down (W β E) | +11 min |
| 10:12 | π 2A12 | Manningtree β Harwich Town Down (W β E) | active |
| 10:22 | π 6Y53 | Parkeston S.S. β Ipswich Griffin Wharf Up (E β W) | sched |
On todayβs timetable, Wrabness Station crossing is predicted to be closed for about 3 h 55 min between 06:00 and 22:00, across roughly 49 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.6 min (07:08–07:15, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:52β07:52 in the morning and around 20:53β21:53 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Wrabness, Essex, next to the station.
Wrabness Station is a signal-box-controlled crossing (SBCMSL) on the MistleyβParkeston SS GBRF line (Anglia route · ELR MAH). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 195 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 89.8% of the warnings we could verify came true.