Moreton On Lugg level crossing

Manually-controlled barrier level crossing on the Wales route (ELR SHL).

right now
OPEN
for 26 min
next: 🚛 in 29 min · scheduled

Next 30 min

OPEN 01:14–01:40 26m
CLOSED 01:40–01:43 3m
OPEN 01:43–02:02 → 19m
Under the hood
Fri 24 Jul · 01:14
Today Tomorrow

Trains in window

01:43 6M15 🚛 MRTNFHH → RADLTRR ← from Great Malvern sched
🚛Freight
now 01:14:24 · 81 avg · 1 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Moreton On Lugg crossing is predicted to be closed for about 3 h 41 min between 06:00 and 22:00, across roughly 48 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:53–07:53 in the morning and around 19:14–20:14 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Moreton On Lugg is a manually-controlled barrier crossing (MCB/MB) on the Great Malvern–Hereford line (Wales route · ELR SHL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?