Automatic half-barrier level crossing on the Wales route (ELR SHL).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:04 | π 1W55 | Cardiff Central β Manchester Piccadilly Up (S β N) | +1 min |
| 10:04 | π 1V92 | Holyhead β Cardiff Central Down (N β S) | +1 min |
| 10:17 | β 0V07 | Basford Hall Yard β Stoke Gifford FHH Down (N β S) | cancelled |
On todayβs timetable, Wellington crossing is predicted to be closed for about 2 h 9 min between 06:00 and 22:00, across roughly 49 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:30β07:30 in the morning and around 14:01β15:01 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is near Marden, Herefordshire.
Wellington is a automatic half-barrier crossing (AHB) on the Coleham LMDβHereford line (Wales route · ELR SHL). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β