North Carr level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR SPD4).

predicted
OPEN
for 11 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 15 min Β· running

Next 30 min

OPEN 09:35–09:47 11m
CLOSED 09:47–09:50 3m
OPEN 09:50–09:59 9m
CLOSED 09:59–10:03 5m
OPEN 10:03–10:38 β†’ 35m
Under the hood
Sat 17 Oct Β· 09:35
Today Tomorrow

Trains in window

09:26 πŸš› 6E57 Renwick Road Biffa GBRf β†’ Doncaster Down Decoy GBRF Down (S β†’ N) no show
09:30 πŸšƒ 4B49 Drax Power Station β†’ Immingham Biomass LP (DBS) Up (N β†’ S) +1 min
09:50 πŸš† 2K51 Doncaster β†’ Lincoln Up (N β†’ S) active
10:03 πŸš› 4E14 Felixstowe South GBRF β†’ Doncaster Iport GBRF Down (S β†’ N) -1 min
10:04 πŸš› 4E14 Felixstowe North GBRF β†’ Doncaster Iport GBRF Down (S β†’ N) no show
πŸš†Passenger πŸšƒEmpty stock πŸš›Freight
now 09:35:36 Β· 89 avg Β· 5 in window
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 40,856 active Β· 36,290 delays Β· 2,723 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, North Carr crossing is predicted to be closed for about 1 h 28 min between 06:00 and 22:00, across roughly 18 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:18–08:18 in the morning and around 17:42–18:42 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on North Carr Road near Misterton, Nottinghamshire.

North Carr is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Lincoln–Doncaster Down Decoy GBRF line (North and East route · ELR SPD4). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?