Sandilands level crossing

Automatic barrier locally monitored level crossing on the Wales route (ELR DJP).

predicted
OPEN
for at least 2h

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 04:55–06:55+ 2h+
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 04:55:33 · 18 avg · 0 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,561 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Sandilands crossing is predicted to be closed for about 38 min between 06:00 and 22:00, across roughly 13 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:31–09:31 in the morning and around 13:24–14:24 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Sandilands is a automatic barrier locally monitored crossing (ABCL) on the Machynlleth–Barmouth line (Wales route · ELR DJP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →