Ynyslas level crossing

Automatic half-barrier level crossing on the Wales route (ELR SBA2).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · 1 min late

Next 30 min

CLOSED 04:55–04:56 1m
OPEN 04:56–05:35 → 39m
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

04:56 🚆 2J39 MachynllethAberystwyth Down (NE → SW) +1 min
🚆Passenger
now 04:55:00 · 35 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,551 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Ynyslas crossing is predicted to be closed for about 1 h 15 min between 06:00 and 22:00, across roughly 29 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (04:47–04:49, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:48–11:48 in the morning and around 16:03–17:03 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Ynyslas is a automatic half-barrier crossing (AHB) on the Down–Aberystwyth line (Wales route · ELR SBA2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 220 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.3% of the warnings we could verify came true.

Typical timing error was ±501s (9 in 10 within 774s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?