Second Drove level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 1 min Β· 1 min early

Next 30 min

CLOSED 09:59–10:01 2m
OPEN 10:01–10:06 5m
CLOSED 10:06–10:08 2m
OPEN 10:08–10:15 7m
CLOSED 10:15–10:16 2m
OPEN 10:16–10:25 8m
CLOSED 10:25–10:26 2m
OPEN 10:26–10:29 3m
CLOSED 10:29–10:30 β†’ 2m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:54 πŸš„ 1R66 Norwich β†’ Liverpool Lime Street HL/ML Down (SE β†’ NW) on time
10:01 πŸš› 6L83 Peak Forest R.M.C. Sdgs β†’ Eccles Rd Johnston'S Sdg Up (NW β†’ SE) approaching
10:08 πŸš› 4M81 Felixstowe North F.L.T. β†’ Garston F.L.T. Down (SE β†’ NW) approaching
10:08 πŸš› 6E85 Middleton Towers GBRF β†’ Barnby Dun Rockware Glass GBRF Down (SE β†’ NW) no show
10:16 πŸš„ 1L05 Sheffield β†’ Norwich Up (NW β†’ SE) +4 min
10:26 πŸš† 2L73 Peterborough β†’ Ipswich Up (NW β†’ SE) +2 min
10:30 πŸš„ 1N49 Stansted Airport β†’ Birmingham New Street Down (SE β†’ NW) +9 min
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 09:59:41 Β· 221 avg Β· 7 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Second Drove crossing is predicted to be closed for about 3 h 17 min between 06:00 and 22:00, across roughly 78 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.6 min (09:48–09:52, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:38–11:38 in the morning and around 14:11–15:11 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Second Drove near Ely, Cambridgeshire.

Second Drove is a automatic half-barrier crossing (AHB) on the Ely–March Up Yard GBRF line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 650 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?