Third drove level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

predicted
OPEN
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 5 min · 5 min late

Next 30 min

OPEN 09:21–09:25 4m
CLOSED 09:25–09:27 2m
OPEN 09:27–09:47 21m
CLOSED 09:47–09:49 2m
OPEN 09:49–09:54 → 5m
Under the hood
Mon 07 Sep · 09:21
Today Tomorrow

Trains in window

09:23 0E94 Doncaster D.C.E Sdgs.Welwyn G.C. F.D. Up (NW → SE) no show
09:26 🚄 1N47 Stansted AirportBirmingham New Street Down (SE → NW) +5 min
09:27 0L97 Peterborough North Yd GBRfIpswich Down and Up Goods Up (NW → SE) no show
09:36 🚛 4L03 Doncaster Iport GBRFFelixstowe South GBRF Up (NW → SE) no show
09:45 🚛 4M54 Parkeston S.S.Tunstead Sdgs (FHH) Down (SE → NW) no show
09:49 🚄 1L30 Birmingham New StreetStansted Airport Up (NW → SE) +4 min
🚄Express passenger 🚛Freight Other
now 09:21:28 · 160 avg · 6 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,495 active · 28,111 delays · 3,113 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Third drove crossing is predicted to be closed for about 3 h 33 min between 06:00 and 22:00, across roughly 69 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.7 min (08:21–08:24, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:07–11:07 in the morning and around 14:07–15:07 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Third drove is a automatic half-barrier crossing (AHB) on the Ely–March Up Yard GBRF line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 366 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.6% of the warnings we could verify came true.

Typical timing error was ±8s (9 in 10 within 479s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?