Manually-controlled barrier with obstacle detection level crossing on the Anglia route (ELR ETN).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:52 | π 1K62 | Cambridge β Norwich Down (W β E) | +2 min |
| 10:17 | π 1K67 | Norwich β Stansted Airport Up (E β W) | on time |
| 10:27 | β 0H03 | Brandon Goods Loop β Brandon Goods Loop Up (E β W) | cancelled |
| 10:32 | π 1L05 | Sheffield β Norwich Down (W β E) | +4 min |
On todayβs timetable, Shippea hill crossing is predicted to be closed for about 4 h 44 min between 06:00 and 22:00, across roughly 63 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:35β09:35 in the morning and around 19:28β20:28 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Burnt Fen Turnpike near Ely, Cambridgeshire, next to Shippea Hill station.
Shippea hill is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the ElyβThetford line (Anglia route · ELR ETN). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β