Shippea hill level crossing

Manually-controlled barrier with obstacle detection level crossing on the Anglia route (ELR ETN).

predicted
OPEN
for 8 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 11 min Β· 4 min late

Next 30 min

OPEN 07:06–07:14 8m
CLOSED 07:14–07:17 3m
MAY OPEN 07:17–07:19 2m
CLOSED 07:19–07:22 3m
MAY OPEN 07:22–07:23 46s
CLOSED 07:23–07:26 3m
OPEN 07:26–07:31 5m
CLOSED 07:31–07:34 3m
OPEN 07:34–08:13 β†’ 38m
Under the hood
Mon 12 Oct Β· 07:06
Today Tomorrow

Trains in window

07:17 πŸš„ 1L01 Nottingham β†’ Norwich Down (W β†’ E) +4 min
07:22 πŸš„ 1K59 Lowestoft β†’ Cambridge Up (E β†’ W) on time
07:26 πŸš† 2K58 Cambridge β†’ Norwich Down (W β†’ E) on time
07:34 πŸš„ 1G62 Norwich β†’ Nottingham Up (E β†’ W) +1 min
πŸš„Express passenger πŸš†Passenger
now 07:06:11 Β· 85 avg Β· 4 in window
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,701 active Β· 24,989 delays Β· 2,510 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Shippea hill crossing is predicted to be closed for about 4 h 22 min between 06:00 and 22:00, across roughly 60 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:35–09:35 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Burnt Fen Turnpike near Ely, Cambridgeshire, next to Shippea Hill station.

Shippea hill is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Ely–Thetford line (Anglia route · ELR ETN). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?