Strensall No.2 level crossing

CCTV-monitored manual barrier level crossing on the North and East route (ELR YMS).

predicted
OPEN
for 6 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚧 in 9 min · 7 min early

Next 30 min

OPEN 10:18–10:24 6m
CLOSED 10:24–10:27 3m
OPEN 10:27–10:31 4m
CLOSED 10:31–10:34 3m
OPEN 10:34–11:15 β†’ 41m
Under the hood
Sat 17 Oct Β· 10:18
Today Tomorrow

Trains in window

10:18 πŸš„ 1P17 Manchester Airport β†’ Scarborough Down (SW β†’ NE) +1 min
10:27 🚧 3J51 York Thrall Europa β†’ York Thrall Europa Down (SW β†’ NE) -7 min
10:34 πŸš„ 1P18 Scarborough β†’ Manchester Airport Up (NE β†’ SW) +2 min
πŸš„Express passenger 🚧Engineering
now 10:18:34 Β· 36 avg Β· 3 in window
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 41,787 active Β· 37,096 delays Β· 2,836 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Strensall No.2 crossing is predicted to be closed for about 2 h 9 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:17–07:17 in the morning and around 12:31–13:31 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Princess Road in Strensall, North Yorkshire.

Strensall No.2 is a CCTV-monitored manual barrier crossing (CCTV) on the York–Scarborough line (North and East route · ELR YMS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?