Weig Lane level crossing

CCTV-monitored manual barrier level crossing on the Wales route (ELR SBA2).

predicted
OPEN
for 14 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 17 min · 1 min early

Next 30 min

OPEN 07:12–07:26 14m
CLOSED 07:26–07:30 3m
OPEN 07:30–08:08 → 39m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:12 🚄 1J00 WelshpoolAberystwyth Down (SE → NW) on time
07:29 🚄 1S10 AberystwythShrewsbury Up (NW → SE) -1 min
🚄Express passenger
now 07:12:34 · 29 avg · 2 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,042 delays · 3,032 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Weig Lane crossing is predicted to be closed for about 1 h 57 min between 06:00 and 22:00, across roughly 26 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (06:09–06:13, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:29–11:29 in the morning and around 12:28–13:28 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Weig Lane is a cctv-monitored manual barrier crossing (CCTV) on the Coleham LMD–Machynlleth line (Wales route · ELR SBA2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 178 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Typical timing error was ±269s (9 in 10 within 349s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?