Aberdeen Station level crossing

Signal-box-controlled level crossing on the Scotland route (ELR ANI1).

predicted
CLOSED
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 3 min Β· running

Next 30 min

CLOSED 06:11–06:16 4m
OPEN 06:16–06:28 12m
CLOSED 06:28–06:31 3m
OPEN 06:31–06:36 4m
CLOSED 06:36–06:39 3m
OPEN 06:39–07:05 β†’ 26m
Under the hood
Wed 11 Nov Β· 06:11
Today Tomorrow

Trains in window

06:14 πŸš„ 1H35 Aberdeen β†’ Inverness Down (SE β†’ NW) active
06:16 πŸš† 2B14 Aberdeen β†’ Montrose Up (NW β†’ SE) active
06:31 πŸšƒ 5A62 Aberdeen β†’ Huntly Down (SE β†’ NW) active
06:39 πŸš„ 1T14 Aberdeen β†’ Glasgow Queen St High Level Up (NW β†’ SE) active
πŸš„Express passenger πŸš†Passenger πŸšƒEmpty stock
now 06:11:49 Β· 157 avg Β· 4 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,681 active Β· 31,187 delays Β· 1,994 cancelled Β· 0 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway β†’

About this crossing

How often it closes

On today’s timetable, Aberdeen Station crossing is predicted to be closed for about 7 h 58 min between 06:00 and 22:00, across roughly 101 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:53–09:53 in the morning and around 17:00–18:00 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in City Centre, Aberdeen.

Aberdeen Station is a signal-box-controlled crossing (SBC) on the Montrose–Inverurie line (Scotland route · ELR ANI1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?