On todayβs timetable, Aberdeen Station crossing is predicted to be closed for about 7 h 28 min between 06:00 and 22:00, across roughly 95 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:52β09:52 in the morning and around 16:20β17:20 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in City Centre, Aberdeen.
Aberdeen Station is a signal-box-controlled crossing (SBC) on the MontroseβInverurie line (Scotland route · ELR ANI1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.