Aberdeen Station level crossing

Signal-box-controlled level crossing on the Scotland route (ELR ANI1).

predicted
OPEN
for 5 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 8 min Β· running

Next 30 min

OPEN 10:00–10:05 5m
CLOSED 10:05–10:08 3m
OPEN 10:08–10:15 6m
CLOSED 10:15–10:19 4m
OPEN 10:19–10:32 β†’ 13m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:52 πŸš„ 1E16 Aberdeen β†’ London Kings Cross Up (NW β†’ SE) on time
10:08 πŸš„ 1H49 Aberdeen β†’ Inverness Down (SE β†’ NW) active
10:18 πŸš„ 1A33 Glasgow Queen St High Level β†’ Aberdeen Down (SE β†’ NW) on time
10:19 πŸš† 2B22 Inverurie β†’ Montrose Up (NW β†’ SE) on time
πŸš„Express passenger πŸš†Passenger
now 10:00:03 Β· 149 avg Β· 4 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway β†’

About this crossing

How often it closes

On today’s timetable, Aberdeen Station crossing is predicted to be closed for about 7 h 28 min between 06:00 and 22:00, across roughly 95 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:52–09:52 in the morning and around 16:20–17:20 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in City Centre, Aberdeen.

Aberdeen Station is a signal-box-controlled crossing (SBC) on the Montrose–Inverurie line (Scotland route · ELR ANI1). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?