Balderton level crossing

Manually-controlled barrier with obstacle detection level crossing on the North West route (ELR WSJ2).

predicted
OPEN
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 6 min · on time

Next 30 min

OPEN 07:39–07:42 4m
CLOSED 07:42–07:45 3m
OPEN 07:45–07:47 2m
CLOSED 07:47–07:50 3m
OPEN 07:50–08:12 → 22m
Under the hood
Tue 06 Oct · 07:39
Today Tomorrow

Trains in window

07:45 🚄 1J93 Chester → Shrewsbury Up (N → S) on time
07:50 🚄 1K05 Wrexham General → Crewe Down (S → N) active
07:50 🚄 1J56 Crewe → Wrexham General Up (N → S) approaching
🚄Express passenger
now 07:39:04 · 83 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,426 active · 31,722 delays · 1,706 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Balderton crossing is predicted to be closed for about 3 h 43 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (05:15–05:18, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:20–07:20 in the morning and around 19:46–20:46 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Balderton is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Chester Middle Yard–Chester line (North West route · ELR WSJ2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 268 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Full accuracy report →

Is this right?