Manually-controlled barrier level crossing on the Wales route (ELR WSJ2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:58 | π 6V75 | Dee Marsh Recp. Sdgs β Margam T.C. Up (N β S) | -9 min |
| 10:03 | π 5K08 | Wrexham General β Wrexham General Up (N β S) | active |
| 10:04 | π 1W92 | Cardiff Central β Holyhead Down (S β N) | +1 min |
| 10:11 | β 0V41 | Tuebrook Sdg GBRF β Penyffordd Cement GBRF Up (N β S) | +74 min |
On todayβs timetable, Croes Newydd North Fork crossing is predicted to be closed for about 3 h between 06:00 and 22:00, across roughly 42 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:31β07:31 in the morning and around 20:00β21:00 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Watery Road in Wrexham, next to Wrexham Central station.
Croes Newydd North Fork is a manually-controlled barrier crossing (MCB/MB) on the Wrexham CentralβDee Marsh Recp. Sdgs line (Wales route · ELR WSJ2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β