CCTV-monitored manual barrier level crossing on the North West route (ELR MSM).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Bare Lane crossing is predicted to be closed for about 2 h 45 min between 06:00 and 22:00, across roughly 41 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (05:35–05:39, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 08:44–09:44 in the morning and around 16:20–17:20 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Bare Lane in Bare, Lancashire, next to Bare Lane station.
Bare Lane is a CCTV-monitored manual barrier crossing (CCTV) on the Lancaster–Morecambe line (North West route · ELR MSM). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 153 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±23s (9 in 10 within 148s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.