Manual gate level crossing on the North and East route (ELR MDL1).
| No trains in the next 30 minutes. |
On today’s timetable, Batley (mgh) crossing is predicted to be closed for about 10 h 32 min between 06:00 and 22:00, across roughly 98 closures. The longest single predicted closure is 17 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:51–09:51 in the morning and around 18:47–19:47 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Batley (mgh) is a manual gate crossing (MGH) on the Dewsbury–Leeds line (North and East route · ELR MDL1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 2 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±3s (9 in 10 within 71s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.