Black Bush level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

predicted
CLOSED
for 12s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 11 min Β· on time

Next 30 min

CLOSED 07:34–07:34 12s
OPEN 07:34–07:43 9m
CLOSED 07:43–07:45 2m
OPEN 07:45–07:55 10m
CLOSED 07:55–07:57 2m
OPEN 07:57–08:20 β†’ 23m
Under the hood
Mon 12 Oct Β· 07:34
Today Tomorrow

Trains in window

07:32 πŸš† 2E70 Colchester β†’ Peterborough Down (SE β†’ NW) +2 min
07:34 πŸš„ 1R60 Norwich β†’ Liverpool Lime Street HL/ML Down (SE β†’ NW) +20 min
07:45 πŸš„ 1L02 Nottingham β†’ Norwich Up (NW β†’ SE) on time
07:45 πŸš„ 1N43 Stansted Airport β†’ Birmingham New Street Down (SE β†’ NW) +4 min
07:56 πŸš† 2L71 Peterborough β†’ Ipswich Up (NW β†’ SE) active
08:04 ❓ 0L97 Peterborough North Yd GBRf β†’ Ipswich Down and Up Goods Up (NW β†’ SE) sched
πŸš„Express passenger πŸš†Passenger ❓Other
now 07:34:38 Β· 226 avg Β· 6 in window
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,802 active Β· 25,738 delays Β· 2,542 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Black Bush crossing is predicted to be closed for about 3 h 13 min between 06:00 and 22:00, across roughly 78 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:17–10:17 in the morning and around 19:00–20:00 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Blackbush Drove in Whittlesey, Cambridgeshire.

Black Bush is a automatic half-barrier crossing (AHB) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?