Eastrea level crossing

Automatic half-barrier level crossing on the Anglia route (ELR EMP).

predicted
OPEN
for 25 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 26 min · running

Next 30 min

OPEN 04:56–05:21 25m
CLOSED 05:21–05:23 2m
OPEN 05:23–05:54 → 31m
Under the hood
Mon 07 Sep · 04:56
Today Tomorrow

Trains in window

04:51 🚧 6J56 WhittleseaEly Recp. Up (W → E) cancelled
05:22 🚛 4L20 Peterborough North Yd GBRfFelixstowe North GBRF Up (W → E) active
🚛Freight 🚧Engineering
now 04:56:37 · 170 avg · 2 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,725 active · 21,573 delays · 2,956 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Eastrea crossing is predicted to be closed for about 3 h 9 min between 06:00 and 22:00, across roughly 80 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:11–10:11 in the morning and around 19:03–20:03 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Eastrea is a automatic half-barrier crossing (AHB) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?