Manual gate level crossing on the Anglia route (ELR EMP).
| 00:05 | 2C68 | 🚆 | KNGX → CAMBDGE | → from Peterborough | +7 min |
| 00:08 | 1T97 | 🚄 | KLYNN → KNGX | ← from March Up Yard GBRF | on time |
| 00:12 | 6L34 | 🚧 | HOOJUYD → WHTMLDC | → from Peterborough | no show |
| 00:29 | 5H88 | 🚃 | ILFEMUD → CAMBCSN | → from Peterborough | no show |
| 00:32 | 1T72 | 🚄 | KNGX → KLYNN | → from Peterborough | no show |
| 00:34 | 2C70 | 🚆 | KNGX → CAMBDGE | → from Peterborough | +5 min |
| 00:36 | 9S68 | 🚄 | BRGHTN → CAMBDGE | → from Peterborough | +2 min |
| 00:39 | 4L61 | 🚛 | GRSTNFT → FLXSNFL | → from Peterborough | no show |
| 00:43 | 2H72 | 🚆 | LIVST → CAMBDGE | → from Peterborough | -1 min |
| 00:45 | 4L10 | 🚛 | DONCBDY → FLXSNEW | → from Peterborough | no show |
On today’s timetable, Whittlesea crossing is predicted to be closed for about 11 h 51 min between 06:00 and 22:00, across roughly 70 closures. The longest single predicted closure is 23 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:12–08:12 in the morning and around 17:18–18:18 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Whittlesea is a manual gate crossing (MGH) on the March Up Yard GBRF–Peterborough line (Anglia route · ELR EMP). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →