CCTV-monitored manual barrier level crossing on the Central route (ELR OWW).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:56 | π 2S37 | Kidderminster β Stratford-upon-Avon Down (SW β NE) | passed |
| 09:57 | π 5H14 | Birmingham New Street β Tyseley LMD Up (NE β SW) | no show |
| 10:02 | π 2V28 | Dorridge β Worcester Foregate Street Up (NE β SW) | approaching |
| 10:05 | π 6M81 | Margam T.C. β Round Oak Down (SW β NE) | no show |
| 10:13 | π 2D39 | Worcester Foregate Street β Stratford-upon-Avon Down (SW β NE) | on time |
| 10:22 | π 2K30 | Stratford-upon-Avon β Kidderminster Up (NE β SW) | +1 min |
| 10:23 | π 6V05 | Round Oak β Margam T.C. Up (NE β SW) | -2 min |
| 10:26 | π 6V34 | Kineton MOD GBRf β Ashchurch MOD GBRf Up (NE β SW) | no show |
| 10:27 | π 2S41 | Kidderminster β Whitlocks End Down (SW β NE) | active |
On todayβs timetable, Blakedown Station crossing is predicted to be closed for about 8 h 54 min between 06:00 and 22:00, across roughly 113 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 5.8 min (08:50–08:56, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:11β08:11 in the morning and around 16:28β17:28 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Blakedown, Worcestershire, next to the station.
Blakedown Station is a CCTV-monitored manual barrier crossing (CCTV) on the KidderminsterβStourbridge Junction line (Central route · ELR OWW). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 842 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.
Typical timing error was Β±10s (9 in 10 within 125s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.