Blakedown Station level crossing

CCTV-monitored manual barrier level crossing on the Central route (ELR OWW).

predicted
OPEN
for 6 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 10 min · 7 min late

Next 30 min

OPEN 08:00–08:07 6m
CLOSED 08:07–08:10 3m
OPEN 08:10–08:16 6m
CLOSED 08:16–08:20 3m
MAY OPEN 08:20–08:20 32s
CLOSED 08:20–08:24 4m
OPEN 08:24–08:38 → 14m
Under the hood
Tue 06 Oct · 08:00
Today Tomorrow

Trains in window

07:57 🚆 2S21 Kidderminster → Stratford-upon-Avon Down (SW → NE) passed
08:10 🚆 2V12 Dorridge → Worcester Foregate Street Up (NE → SW) approaching
08:20 🚆 2D23 Worcester Foregate Street → Stratford-upon-Avon Down (SW → NE) +6 min
08:24 🚆 2S25 Kidderminster → Whitlocks End Down (SW → NE) active
08:24 🚆 2K14 Stratford-upon-Avon → Kidderminster Up (NE → SW) +1 min
🚆Passenger
now 08:00:38 · 150 avg · 5 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,459 active · 31,742 delays · 1,717 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Blakedown Station crossing is predicted to be closed for about 8 h 46 min between 06:00 and 22:00, across roughly 112 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 10.4 min (06:40–06:50, 4 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:11–08:11 in the morning and around 16:28–17:28 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Blakedown Station is a cctv-monitored manual barrier crossing (CCTV) on the Kidderminster–Stourbridge Junction line (Central route · ELR OWW). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 816 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.

Typical timing error was ±11s (9 in 10 within 126s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?