CCTV-monitored manual barrier level crossing on the Anglia route (ELR BOK5).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Bollo Lane (Kew line) crossing is predicted to be closed for about 26 min between 06:00 and 22:00, across roughly 5 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 5.5 min (07:05–07:10, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 12:19–13:19 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bollo Lane (Kew line) is a cctv-monitored manual barrier crossing (CCTV) on the Willesden Jn. High Level–Gunnersbury line (Anglia route · ELR BOK5). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,025 trains through this crossing.
98.8% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±11s (9 in 10 within 41s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.