CCTV-monitored manual barrier level crossing on the Wessex route (ELR RDG1).
| 00:17 | 2S79 | 🚆 | WATRLMN → HOUNSLW | ← from Barnes | approaching |
| 00:17 | 2C80 | 🚆 | RDNG4AB → WATRLMN | → from Twickenham | -1 min |
| 00:22 | 2U79 | 🚆 | WATRLMN → STAINES | ← from Barnes | +2 min |
| 00:23 | 2O77 | 🚆 | WATRLMN → STRWBYH | ← from Barnes | on time |
On today’s timetable, White Hart Lane crossing is predicted to be closed for about 12 h 51 min between 06:00 and 22:00, across roughly 65 closures. The longest single predicted closure is 40 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:11–08:11 in the morning and around 17:43–18:43 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
White Hart Lane is a cctv-monitored manual barrier crossing (CCTV) on the Barnes–Twickenham line (Wessex route · ELR RDG1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 341 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.
Typical timing error was ±31s (9 in 10 within 113s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.