Boroughbridge Road level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR LLP2).

predicted
CLOSED
for 59s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: ❓ now · scheduled

Next 30 min

CLOSED 17:48–17:49 59s
OPEN 17:49–18:17 28m
CLOSED 18:17–18:20 → 3m
Under the hood
Thu 08 Oct · 17:48
Today Tomorrow

Trains in window

17:49 ❓ 1N10 ? → ? Down (SE → NW) approaching
17:49 🚛 6E26 Knowsley Freight Terminal → Wilton EFW Terminal Down (SE → NW) -1 min
18:09 🚛 6D43 Jarrow Prax → Lindsey Oil Refinery Up (NW → SE) no show
18:13 🚛 6E83 Horton in Rib Quarry GBRf → Phillips Loop Down (SE → NW) no show
18:20 🚛 2Q54 Wakefield K.Whithams Cobra → Whitby Down (SE → NW) -1 min
🚛Freight ❓Other
now 17:48:46 · 70 avg · 5 in window
live observation: 2 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,687 active · 32,057 delays · 2,189 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Boroughbridge Road crossing is predicted to be closed for about 42 min between 06:00 and 22:00, across roughly 8 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.4 min (23:57–00:03, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:25–08:25 in the morning and around 16:51–17:51 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Boroughbridge Road is a cctv-monitored manual barrier crossing (CCTV) on the York–Darlington line (East Coast route · ELR LLP2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 376 trains through this crossing.

99.5% of observed passes were being warned about on this page when they passed, and 97.2% of the warnings we could verify came true.

Typical timing error was ±113s (9 in 10 within 219s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →