Boroughbridge Road level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR LLP2).

right now
OPEN
for 11 min
next: 🚃 in 14 min · 27 min early

Next 30 min

OPEN 00:16–00:27 11m
CLOSED 00:27–00:30 3m
OPEN 00:30–00:32 3m
CLOSED 00:32–00:36 3m
OPEN 00:36–00:44 9m
CLOSED 00:44–00:48 → 3m
Under the hood
Fri 24 Jul · 00:16
Today Tomorrow

Trains in window

00:13 6N77 🚛 RSNGTCL → TEESY ← from York no show
00:19 6D15 🚛 REDCROT → SCNTTTC → from Darlington no show
00:24 5Q59 🚛 DONC → NWCSTLE ← from York cancelled
00:30 5Y91 🚃 NWCSTLE → YORK → from Darlington -27 min
00:35 5Q09 🚛 YORK → DLTN ← from York active
00:39 4S04 🚛 DONCIGB → MOSEPDS ← from York no show
00:46 6X36 🚛 MLRHY → DONCUDY → from Darlington no show
00:47 1N34 🚄 KNGX → NWCSTLE ← from York on time
🚄Express passenger 🚃Empty stock 🚛Freight
now 00:16:06 · 356 avg · 8 in window
lx berths down: Y1/0465→Y1/[email protected] · down: Y1/0466→Y1/[email protected] · down: Y1/0467→Y1/[email protected] · down: Y1/0468→Y1/[email protected] · down: Y1/0474→Y1/[email protected] · up: Y1/0478→Y1/[email protected] · up: Y1/0692→Y1/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,036 active · 29,996 delays · 1,739 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Boroughbridge Road crossing is predicted to be closed for about 11 h 54 min between 06:00 and 22:00, across roughly 96 closures. The longest single predicted closure is 26 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:15–11:15 in the morning and around 16:27–17:27 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Boroughbridge Road is a cctv-monitored manual barrier crossing (CCTV) on the York–Darlington line (East Coast route · ELR LLP2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 826 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.9% of the warnings we could verify came true.

Typical timing error was ±46s (9 in 10 within 130s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?