Low Gates level crossing

Manually-controlled barrier level crossing on the East Coast route (ELR LEN3).

predicted
OPEN
for 8 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 11 min Β· 5 min late

Next 30 min

OPEN 09:59–10:07 8m
CLOSED 10:07–10:10 3m
OPEN 10:10–10:16 6m
CLOSED 10:16–10:21 5m
OPEN 10:21–10:25 4m
CLOSED 10:25–10:28 3m
OPEN 10:28–10:40 β†’ 12m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

10:10 πŸš„ 1P65 Manchester Airport β†’ Redcar Central Down (S β†’ N) +5 min
10:11 πŸš› 6L65 Thrislington GBRF β†’ Barrington PAD GBRF Up (N β†’ S) no show
10:13 🚧 6Q71 Morpeth Barmoor Through Siding β†’ Thirsk Up (N β†’ S) no show
10:21 πŸš› 6M16 Wilton EFW Terminal β†’ Knowsley Freight Terminal Up (N β†’ S) -13 min
10:28 πŸš„ 1N90 London Kings Cross β†’ Sunderland Down (S β†’ N) on time
πŸš„Express passenger πŸš›Freight 🚧Engineering
now 09:59:02 Β· 117 avg Β· 5 in window
live observation: 1 up Β· 0 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Low Gates crossing is predicted to be closed for about 3 h 54 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:51–00:54, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:26–08:26 in the morning and around 16:19–17:19 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Darlington Road in Northallerton, North Yorkshire.

Low Gates is a manually-controlled barrier crossing (MCB/MB) on the Northallerton–Up line (East Coast route · ELR LEN3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?