Castle Hills Farm level crossing

Trainman-operated gate level crossing on the East Coast route (ELR REB4).

right now
OPEN
for 13 min
next: 🚛 in 14 min · running

Next 30 min

OPEN 01:15–01:28 13m
CLOSED 01:28–01:30 2m
OPEN 01:30–01:53 → 23m
Under the hood
Fri 24 Jul · 01:15
Today Tomorrow

Trains in window

01:10 4M51 🚛 STHBDRS → DIRFDR2 → from Darlington -6 min
01:30 5Q10 🚛 DLTN → YORK → from Darlington active
01:36 6M26 🚛 WLTNEFW → KNOWFT → from Darlington cancelled
🚛Freight
now 01:15:44 · 357 avg · 3 in window
lx berths down: Y1/0467→Y1/[email protected] · down: Y1/0471→Y1/[email protected] · down: Y1/0474→Y1/[email protected] · up: Y1/0478→Y1/[email protected] · up: Y1/0498→Y1/[email protected] · up: Y1/0692→Y1/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Castle Hills Farm crossing is predicted to be closed for about 8 h 25 min between 06:00 and 22:00, across roughly 158 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:00–00:01, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:15–11:15 in the morning and around 12:21–13:21 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Castle Hills Farm is a trainman-operated gate crossing (TOG) on the York–Darlington line (East Coast route · ELR REB4). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,527 trains through this crossing.

88.1% of observed passes were being warned about on this page when they passed, and 97.8% of the warnings we could verify came true.

Typical timing error was ±42s (9 in 10 within 1524s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?