Springwell Lane level crossing

Automatic half-barrier level crossing on the East Coast route (ELR LLP2).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 04:55–05:59 → 64m
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

05:06 🚛 6N54 Scunthorpe Trent T.C.Sunderland Londonderry Sdg Down (S → N) no show
05:11 🚛 6E30 Margam T.C.Hartlepool BSC 20 Mill Down (S → N) no show
🚛Freight
now 04:55:41 · 97 avg · 2 in window
live observation: 3 up · 3 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,561 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Springwell Lane crossing is predicted to be closed for about 2 h 8 min between 06:00 and 22:00, across roughly 55 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (04:41–04:42, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:27–08:27 in the morning and around 15:13–16:13 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Springwell Lane is a automatic half-barrier crossing (AHB) on the York–Darlington line (East Coast route · ELR LLP2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,072 trains through this crossing.

99.6% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Typical timing error was ±22s (9 in 10 within 189s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?