Springwell Lane level crossing

Automatic half-barrier level crossing on the East Coast route (ELR LLP2).

predicted
OPEN
for 17 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 18 min · on time

Next 30 min

OPEN 07:19–07:36 17m
CLOSED 07:36–07:37 2m
OPEN 07:37–07:46 9m
CLOSED 07:46–07:47 2m
OPEN 07:47–07:58 → 10m
Under the hood
Tue 06 Oct · 07:19
Today Tomorrow

Trains in window

07:13 🚄 1P59 Manchester Airport → Redcar Central Down (S → N) +7 min
07:22 🚛 6E55 Cardiff Tidal T.C. → Sunderland Ward Bros Down (S → N) no show
07:31 🚛 6D11 Tees Dock BSC Export Berth → Gascoigne Wood Up (FHH) Up (N → S) no show
07:37 🚄 1P62 Redcar Central → Manchester Airport Up (N → S) on time
07:47 🚄 1A60 Sunderland → London Kings Cross Up (N → S) +3 min
🚄Express passenger 🚛Freight
now 07:19:33 · 118 avg · 5 in window
live observation: 3 up · 3 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,398 active · 31,706 delays · 1,702 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Springwell Lane crossing is predicted to be closed for about 2 h 3 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.9 min (06:00–06:04, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:27–08:27 in the morning and around 18:45–19:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Springwell Lane is a automatic half-barrier crossing (AHB) on the York–Darlington line (East Coast route · ELR LLP2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,092 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 99.8% of the warnings we could verify came true.

Typical timing error was ±22s (9 in 10 within 125s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?