Broome Lane level crossing

Automatic half-barrier level crossing on the East Midlands route (ELR GSM3).

predicted
OPEN
for 13 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 14 min Β· 12 min late

Next 30 min

OPEN 07:38–07:51 13m
CLOSED 07:51–07:53 2m
OPEN 07:53–08:27 β†’ 35m
Under the hood
Wed 11 Nov Β· 07:38
Today Tomorrow

Trains in window

07:29 πŸš› 6C80 Peak Forest R.M.C. Sdgs β†’ Limbury Road Up (SW β†’ NE) no show
07:33 πŸš› 4H10 Wellingborough Up TC GBRf β†’ Tunstead Sidings GBRF Down (NE β†’ SW) no show
07:50 πŸšƒ 3A13 Kettering Stabling Sidings β†’ Derby Down (NE β†’ SW) no show
07:52 πŸš„ 1N41 Stansted Airport β†’ Birmingham New Street Down (NE β†’ SW) +12 min
07:55 πŸš› 4M38 Felixstowe North F.L.T. β†’ Garston F.L.T. Down (NE β†’ SW) no show
08:08 πŸš› 4M14 Felixstowe South GBRF β†’ East Mids Gateway Tml GBRf Down (NE β†’ SW) no show
πŸš„Express passenger πŸšƒEmpty stock πŸš›Freight
now 07:38:26 Β· 229 avg Β· 6 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,751 active Β· 31,256 delays Β· 2,062 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Broome Lane crossing is predicted to be closed for about 1 h 47 min between 06:00 and 22:00, across roughly 41 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:23–09:23 in the morning and around 12:59–13:59 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Broome Lane in East Goscote, Leicestershire.

Broome Lane is a automatic half-barrier crossing (AHB) on the Corby–Mountsorrel Sdgs line (East Midlands route · ELR GSM3). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?