Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR HUL1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:48 | π 2C55 | Doncaster β Hull Down (W β E) | no show |
| 09:52 | π 6H84 | Hull Biomass LP (DBS) β Drax Power Station Up (E β W) | no show |
| 09:52 | π 2K08 | Bradford Interchange β Hull Down (W β E) | no show |
| 09:57 | π 1W41 | Sheffield β Scarborough Down (W β E) | on time |
| 09:59 | π 2R04 | Scarborough β York Up (E β W) | approaching |
| 10:12 | π 2C56 | Hull β Doncaster Up (E β W) | +1 min |
| 10:18 | π 1K14 | Hull β Liverpool Lime Street HL/ML Up (E β W) | active |
| 10:19 | π 1K11 | Liverpool Lime Street HL/ML β Hull Down (W β E) | +12 min |
| 10:26 | π 6D09 | Hull Coal Terminal β Ferrybridge PS Gypsum GBRf Up (E β W) | no show |
| 10:30 | π 2K13 | Hull β Bradford Interchange Up (E β W) | active |
On todayβs timetable, Cave crossing is predicted to be closed for about 10 h 43 min between 06:00 and 22:00, across roughly 119 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 12.8 min (09:09–09:22, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:10β10:10 in the morning and around 18:58β19:58 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Ellerker Road in Broomfleet, East Riding of Yorkshire.
Cave is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the GooleβHull Dairycoates Tlcn GBRf line (North and East route · ELR HUL1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 564 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.