Crabley Creek level crossing

Manual gate level crossing on the North and East route (ELR HUL1).

predicted
OPEN
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 6 min Β· 1 min late

Next 30 min

OPEN 10:00–10:03 3m
CLOSED 10:03–10:07 3m
OPEN 10:07–10:14 7m
CLOSED 10:14–10:17 3m
MAY OPEN 10:17–10:18 45s
CLOSED 10:18–10:21 3m
OPEN 10:21–10:26 5m
CLOSED 10:26–10:29 3m
OPEN 10:29–10:31 β†’ 2m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:50 πŸšƒ 6H84 Hull Biomass LP (DBS) β†’ Drax Power Station Up (E β†’ W) no show
09:53 πŸš† 2K08 Bradford Interchange β†’ Hull Down (W β†’ E) no show
09:58 πŸš„ 1W41 Sheffield β†’ Scarborough Down (W β†’ E) -1 min
09:59 πŸš† 2R04 Scarborough β†’ York Up (E β†’ W) passed
10:07 πŸš† 2C56 Hull β†’ Doncaster Up (E β†’ W) approaching
10:17 πŸš„ 1K14 Hull β†’ Liverpool Lime Street HL/ML Up (E β†’ W) active
10:21 πŸš„ 1K11 Liverpool Lime Street HL/ML β†’ Hull Down (W β†’ E) +12 min
10:25 πŸš› 6D09 Hull Coal Terminal β†’ Ferrybridge PS Gypsum GBRf Up (E β†’ W) no show
10:29 πŸš† 2K13 Hull β†’ Bradford Interchange Up (E β†’ W) active
πŸš„Express passenger πŸš†Passenger πŸšƒEmpty stock πŸš›Freight
now 10:00:35 Β· 222 avg Β· 9 in window
live observation: 2 up Β· 0 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,964 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Crabley Creek crossing is predicted to be closed for about 10 h 17 min between 06:00 and 22:00, across roughly 124 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 12.8 min (09:09–09:22, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:14–11:14 in the morning and around 19:21–20:21 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Crabley Lane near South Cave, East Riding of Yorkshire.

Crabley Creek is a manual gate crossing (MGH) on the Goole–Hull Dairycoates Tlcn GBRf line (North and East route · ELR HUL1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 564 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?