Crabley Creek level crossing

Manual gate level crossing on the North and East route (ELR HUL1).

predicted
CLOSED
for 1 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ now Β· on time

Next 30 min

CLOSED 07:18–07:19 1m
OPEN 07:19–07:29 10m
CLOSED 07:29–07:32 3m
OPEN 07:32–07:35 3m
CLOSED 07:35–07:38 3m
OPEN 07:38–07:49 β†’ 10m
Under the hood
Wed 11 Nov Β· 07:18
Today Tomorrow

Trains in window

07:13 πŸš„ 1K08 Hull β†’ Liverpool Lime Street HL/ML Up (E β†’ W) +4 min
07:14 πŸš† 2R01 York β†’ Hull Down (W β†’ E) +2 min
07:15 πŸš„ 1A09 Hull β†’ London Kings Cross Up (E β†’ W) active
07:19 πŸš„ 1K05 Manchester Victoria β†’ Hull Down (W β†’ E) on time
07:32 πŸš› 6D94 Masborough F.D. β†’ Hedon Road Sidings Down (W β†’ E) no show
07:32 πŸš† 2K07 Hull β†’ Bradford Interchange Up (E β†’ W) active
07:38 πŸš„ 1J41 Bridlington β†’ Sheffield Up (E β†’ W) +2 min
πŸš„Express passenger πŸš†Passenger πŸš›Freight
now 07:18:09 Β· 224 avg Β· 7 in window
live observation: 2 up Β· 0 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,736 active Β· 31,243 delays Β· 2,040 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Crabley Creek crossing is predicted to be closed for about 10 h 5 min between 06:00 and 22:00, across roughly 121 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 8.8 min (05:49–05:58, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:14–11:14 in the morning and around 16:23–17:23 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Crabley Lane near South Cave, East Riding of Yorkshire.

Crabley Creek is a manual gate crossing (MGH) on the Goole–Hull Dairycoates Tlcn GBRf line (North and East route · ELR HUL1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 663 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?