Manual gate level crossing on the North and East route (ELR HUL1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:50 | π 6H84 | Hull Biomass LP (DBS) β Drax Power Station Up (E β W) | no show |
| 09:53 | π 2K08 | Bradford Interchange β Hull Down (W β E) | no show |
| 09:58 | π 1W41 | Sheffield β Scarborough Down (W β E) | -1 min |
| 09:59 | π 2R04 | Scarborough β York Up (E β W) | passed |
| 10:07 | π 2C56 | Hull β Doncaster Up (E β W) | approaching |
| 10:17 | π 1K14 | Hull β Liverpool Lime Street HL/ML Up (E β W) | active |
| 10:21 | π 1K11 | Liverpool Lime Street HL/ML β Hull Down (W β E) | +12 min |
| 10:25 | π 6D09 | Hull Coal Terminal β Ferrybridge PS Gypsum GBRf Up (E β W) | no show |
| 10:29 | π 2K13 | Hull β Bradford Interchange Up (E β W) | active |
On todayβs timetable, Crabley Creek crossing is predicted to be closed for about 10 h 17 min between 06:00 and 22:00, across roughly 124 closures. The longest single predicted closure is 13 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 12.8 min (09:09–09:22, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 10:14β11:14 in the morning and around 19:21β20:21 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Crabley Lane near South Cave, East Riding of Yorkshire.
Crabley Creek is a manual gate crossing (MGH) on the GooleβHull Dairycoates Tlcn GBRf line (North and East route · ELR HUL1). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 564 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.