Conington North level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM1).

predicted
OPEN
for 16 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 20 min · 4 min early

Next 30 min

OPEN 02:17–02:32 16m
CLOSED 02:32–02:37 5m
OPEN 02:37–02:53 → 16m
Under the hood
Fri 13 Nov · 02:17
Today Tomorrow

Trains in window

02:13 🚄 9W90 Horsham → Peterborough Down (S → N) passed
02:33 🚛 6M95 Ripple Lane Stora → Peak Forest R.M.C. Sdgs Down (S → N) no show
02:37 🚛 4L88 Leeds F.L.T. → London Gateway Frghtliner Up (N → S) -4 min
02:40 🚛 6M95 Ripple Lane Stora → Peak Forest R.M.C. Sdgs Down (S → N) no show
🚄Express passenger 🚛Freight
now 02:17:13 · 374 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-12..2026-11-14
fetched 02:08:19
trust 32,650 active · 30,817 delays · 2,096 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Conington North crossing is predicted to be closed for about 12 h 41 min between 06:00 and 22:00, across roughly 103 closures. The longest single predicted closure is 26 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.1 min (00:49–00:53, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:14–09:14 in the morning and around 15:46–16:46 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Fen Road near Holme, Cambridgeshire.

Conington North is a CCTV-monitored manual barrier crossing (CCTV) on the Huntingdon–Peterborough line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,960 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.7% of the warnings we could verify came true.

Full accuracy report →

Is this right?