Conington North level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM1).

right now
OPEN
for 11 min
next: 🚄 in 14 min · 2 min late

Next 30 min

OPEN 00:16–00:27 11m
CLOSED 00:27–00:37 10m
OPEN 00:37–00:41 4m
CLOSED 00:41–00:44 3m
OPEN 00:44–00:45 1m
CLOSED 00:45–00:50 → 5m
Under the hood
Fri 24 Jul · 00:16
Today Tomorrow

Trains in window

00:13 1T97 🚄 KLYNN → KNGX → from Peterborough on time
00:26 5H88 🚃 ILFEMUD → CAMBCSN ← from Huntingdon no show
00:27 1T72 🚄 KNGX → KLYNN ← from Huntingdon no show
00:30 9J74 🚄 HORSHAM → PBRO ← from Huntingdon +2 min
00:34 2C70 🚆 KNGX → CAMBDGE ← from Huntingdon +5 min
00:34 1D36 🚄 KNGX → LEEDS ← from Huntingdon +1 min
00:36 6X34 🚧 HOOJUYD → WHTMLDC ← from Huntingdon no show
00:37 9S68 🚄 BRGHTN → CAMBDGE ← from Huntingdon +3 min
00:44 2H72 🚆 LIVST → CAMBDGE ← from Huntingdon on time
00:48 1E30 🚄 EDINBUR → KNGX → from Peterborough on time
🚄Express passenger 🚆Passenger 🚃Empty stock 🚧Engineering
now 00:16:08 · 759 avg · 10 in window
lx berths up: YD/0394→YD/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,036 active · 29,996 delays · 1,739 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Conington North crossing is predicted to be closed for about 14 h 46 min between 06:00 and 22:00, across roughly 41 closures. The longest single predicted closure is 118 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (23:58–00:01, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:36–08:36 in the morning and around 17:13–18:13 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Conington North is a cctv-monitored manual barrier crossing (CCTV) on the Huntingdon–Peterborough line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 7 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±34s (9 in 10 within 307s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?