CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM1).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:52 | π 1S09 | London Kings Cross β Aberdeen Down (S β N) | +8 min |
| 09:52 | π 1Y81 | Middlesbrough β London Kings Cross Up (N β S) | on time |
| 09:54 | π 1D08 | London Kings Cross β Leeds Down (S β N) | +5 min |
| 09:56 | π 1H02 | London Kings Cross β Hull Down (S β N) | passed |
| 09:57 | π 1A11 | Bradford Forster Square β London Kings Cross Up (N β S) | passed |
| 09:59 | π 9J23 | Peterborough β Horsham Up (N β S) | active |
| 09:59 | π 9J16 | Horsham β Peterborough Down (S β N) | approaching |
| 10:00 | π 1E80 | Edinburgh β London Kings Cross Up (N β S) | approaching |
| 10:10 | π 1A12 | Leeds β London Kings Cross Up (N β S) | on time |
| 10:15 | π 1S10 | London Kings Cross β Edinburgh Down (S β N) | +5 min |
| 10:17 | π 1E03 | Edinburgh β London Kings Cross Up (N β S) | +2 min |
| 10:20 | π 4L98 | Masborough N&W GBRF β London Gateway GBRF Up (N β S) | -27 min |
| 10:25 | π 1N04 | London Kings Cross β Newcastle Down (S β N) | +8 min |
| 10:26 | π 1B83 | Lincoln β London Kings Cross Up (N β S) | +2 min |
| 10:27 | π 1D09 | London Kings Cross β Bradford Forster Square Down (S β N) | +4 min |
| 10:28 | π 1N82 | London Kings Cross β York Down (S β N) | +1 min |
| 10:28 | π 9J25 | Peterborough β Horsham Up (N β S) | active |
| 10:30 | π 1E04 | Edinburgh β London Kings Cross Up (N β S) | +9 min |
On todayβs timetable, Holme crossing is predicted to be closed for about 12 h 40 min between 06:00 and 22:00, across roughly 115 closures. The longest single predicted closure is 18 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 17.6 min (08:12–08:30, 7 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:36β08:36 in the morning and around 19:58β20:58 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Long Drove in Holme, Cambridgeshire.
Holme is a CCTV-monitored manual barrier crossing (CCTV) on the HuntingdonβPeterborough line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 2,038 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.