Dunragit level crossing

Manually-controlled barrier level crossing on the Scotland route (ELR STR3).

right now
OPEN
for at least 2h

Next 30 min

OPEN 00:45–02:45+ 2h+
Under the hood
Sat 25 Jul · 00:45
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 00:45:15 · 10 avg · 0 in window
timetable cif full+upd 2026-07-23..2026-07-25
fetched 23:23:05
trust 34,334 active · 30,269 delays · 2,195 cancelled · 0 reconnects
Nearby crossings

All 114 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Dunragit crossing is predicted to be closed for about 36 min between 06:00 and 22:00, across roughly 9 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:09–09:09 in the morning and around 12:14–13:14 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Dunragit is a manually-controlled barrier crossing (MCB/MB) on the Girvan–Stranraer line (Scotland route · ELR STR3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?