Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR TCW1).
| No trains in the next 30 minutes. |
On today’s timetable, Henwick Hall crossing is predicted to be closed for about 1 h 22 min between 06:00 and 22:00, across roughly 19 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:41–07:41 in the morning and around 19:40–20:40 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Henwick Hall is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Micklefield–Selby line (North and East route · ELR TCW1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →