Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR HUL3).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:59 | π 1K11 | Liverpool Lime Street HL/ML β Hull Down (W β E) | +12 min |
| 10:03 | π 6M31 | Hull Dairycoates Tlcn GBRf β Arcow Quarry GBRf Up (E β W) | no show |
| 10:08 | π 2R09 | York β Bridlington Down (W β E) | on time |
| 10:19 | π 6H84 | Hull Biomass LP (DBS) β Drax Power Station Up (E β W) | no show |
| 10:25 | π 2K10 | Bradford Interchange β Hull Down (W β E) | +1 min |
| 10:25 | π 2R04 | Scarborough β York Up (E β W) | on time |
On todayβs timetable, Sandhill Lane (selby) crossing is predicted to be closed for about 6 h 29 min between 06:00 and 22:00, across roughly 82 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 6.6 min (09:44–09:50, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:00β07:00 in the morning and around 12:04β13:04 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Sandhill Lane near Selby, North Yorkshire.
Sandhill Lane (selby) is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the MicklefieldβSelby line (North and East route · ELR HUL3). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 352 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.