Hett Mill level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM5).

predicted
OPEN
for 2 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 4 min · 1 min early

Next 30 min

OPEN 04:54–04:56 2m
CLOSED 04:56–04:58 2m
OPEN 04:58–05:18 20m
CLOSED 05:18–05:23 5m
OPEN 05:23–05:36 → 13m
Under the hood
Mon 07 Sep · 04:54
Today Tomorrow

Trains in window

04:53 🚄 1Y02 NewcastleLondon Kings Cross Up (NW → SE) passed
04:58 🚄 9M05 NewcastleLiverpool Lime Street HL/ML Up (NW → SE) approaching
05:22 🚃 3E03 Heaton T&R.S.M.D.Middlesbrough Up (NW → SE) -5 min
05:23 🚛 4S99 Tees Dock BSC Export BerthGrangemouth TDG Down (SE → NW) -26 min
🚄Express passenger 🚃Empty stock 🚛Freight
now 04:54:26 · 227 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,716 active · 21,543 delays · 2,956 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Hett Mill crossing is predicted to be closed for about 9 h 25 min between 06:00 and 22:00, across roughly 126 closures. The longest single predicted closure is 11 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 8.8 min (00:24–00:33, 3 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:33–07:33 in the morning and around 16:17–17:17 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Hett Mill is a cctv-monitored manual barrier crossing (CCTV) on the Darlington–Tyne S.S. line (East Coast route · ELR ECM5). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,375 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.6% of the warnings we could verify came true.

Typical timing error was ±1s (9 in 10 within 181s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?