Trainman-operated barrier level crossing on the Wales route (ELR CWL2).
| No trains in the next 30 minutes. |
On today’s timetable, Llandrindod Wells crossing is predicted to be closed for about 25 min between 06:00 and 22:00, across roughly 11 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 06:34–07:34 in the morning and around 12:15–13:15 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Llandrindod Wells is a trainman-operated barrier crossing (TMOB) on the Pen-y-bont–Llandrindod line (Wales route · ELR CWL2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →