Llanelli West level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wales route (ELR SWM2).

predicted
CLOSED
for 3 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 3 min · 1 min early

Next 30 min

CLOSED 17:48–17:51 3m
OPEN 17:51–18:01 11m
CLOSED 18:01–18:05 3m
OPEN 18:05–18:21 → 17m
Under the hood
Thu 08 Oct · 17:48
Today Tomorrow

Trains in window

17:50 🚆 2E36 Swansea → Fishguard Harbour Down (SE → NW) approaching
18:04 🚆 2M14 Swansea → Shrewsbury Down (SE → NW) on time
🚆Passenger
now 17:48:16 · 95 avg · 2 in window
live observation: 1 up · 2 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,687 active · 32,055 delays · 2,189 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Llanelli West crossing is predicted to be closed for about 5 h 3 min between 06:00 and 22:00, across roughly 65 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 15.1 min (16:45–17:01, 4 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:32–08:32 in the morning and around 18:05–19:05 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Llanelli West is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Neath–Carmarthen line (Wales route · ELR SWM2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 564 trains through this crossing.

99.1% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.

Typical timing error was ±73s (9 in 10 within 510s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?