Pembrey level crossing

Manually-controlled barrier level crossing on the Wales route (ELR SWM2).

predicted
OPEN
for 18 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 21 min · running

Next 30 min

OPEN 09:21–09:39 18m
CLOSED 09:39–09:42 3m
OPEN 09:42–10:03 → 20m
Under the hood
Mon 07 Sep · 09:21
Today Tomorrow

Trains in window

09:42 🚄 1L16 CarmarthenLondon Paddington Up (W → E) active
🚄Express passenger
now 09:21:28 · 77 avg · 1 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,495 active · 28,111 delays · 3,113 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Pembrey crossing is predicted to be closed for about 3 h 52 min between 06:00 and 22:00, across roughly 52 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:44–10:44 in the morning and around 14:13–15:13 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Pembrey is a manually-controlled barrier crossing (MCB/MB) on the Llanelli–Carmarthen line (Wales route · ELR SWM2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?