Malden level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR NMS1).

predicted
OPEN
for 7s

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 3 min · 1 min early

Next 30 min

OPEN 07:15–07:15 7s
CLOSED 07:15–07:19 3m
OPEN 07:19–07:23 4m
CLOSED 07:23–07:26 3m
OPEN 07:26–07:32 5m
CLOSED 07:32–07:38 7m
OPEN 07:38–07:46 → 8m
Under the hood
Tue 06 Oct · 07:15
Today Tomorrow

Trains in window

07:09 🚆 2H07 London Waterloo → Shepperton Down (E → W) +4 min
07:11 🚆 2H12 Shepperton → London Waterloo Up (W → E) +3 min
07:19 🚆 2K07 London Waterloo → London Waterloo Down (E → W) -1 min
07:26 🚆 2O07 London Waterloo → London Waterloo Up (W → E) +3 min
07:35 🚆 2H09 London Waterloo → Shepperton Down (E → W) on time
07:38 🚆 2H14 Shepperton → London Waterloo Up (W → E) on time
🚆Passenger
now 07:15:48 · 155 avg · 6 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,389 active · 31,698 delays · 1,700 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Malden crossing is predicted to be closed for about 8 h 8 min between 06:00 and 22:00, across roughly 70 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:10–10:10 in the morning and around 18:16–19:16 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Malden is a cctv-monitored manual barrier crossing (CCTV) on the Wimbledon–Berrylands line (Wessex route · ELR NMS1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?