Malden level crossing

CCTV-monitored manual barrier level crossing on the Wessex route (ELR NMS1).

predicted
OPEN
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 7 min Β· 1 min late

Next 30 min

OPEN 09:59–10:03 4m
CLOSED 10:03–10:09 6m
OPEN 10:09–10:15 7m
CLOSED 10:15–10:19 3m
MAY OPEN 10:19–10:20 1m
CLOSED 10:20–10:23 3m
OPEN 10:23–10:32 β†’ 8m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:52 πŸš† 2O17 London Waterloo β†’ London Waterloo Up (W β†’ E) -1 min
10:06 πŸš† 2H19 London Waterloo β†’ Shepperton Down (E β†’ W) +1 min
10:08 πŸš† 2H24 Shepperton β†’ London Waterloo Up (W β†’ E) on time
10:19 πŸš† 2K19 London Waterloo β†’ London Waterloo Down (E β†’ W) -1 min
10:20 πŸšƒ 5Q81 Shepperton β†’ Clapham Yard Sidings Up (W β†’ E) no show
10:23 πŸš† 2O19 London Waterloo β†’ London Waterloo Up (W β†’ E) on time
πŸš†Passenger πŸšƒEmpty stock
now 09:59:08 Β· 158 avg Β· 6 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 234 crossings in Southern β†’

About this crossing

How often it closes

On today’s timetable, Malden crossing is predicted to be closed for about 8 h 12 min between 06:00 and 22:00, across roughly 68 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:10–10:10 in the morning and around 12:41–13:41 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Elm Road in New Malden, London.

Malden is a CCTV-monitored manual barrier crossing (CCTV) on the Wimbledon–Berrylands line (Wessex route · ELR NMS1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?