Manually-controlled barrier level crossing on the Wessex route (ELR WPH1).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Petersfield crossing is predicted to be closed for about 5 h 18 min between 06:00 and 22:00, across roughly 71 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.5 min (00:17–00:20, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:11–08:11 in the morning and around 16:34–17:34 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Petersfield is a manually-controlled barrier crossing (MCB/MB) on the Haslemere–Havant line (Wessex route · ELR WPH1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 693 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±18s (9 in 10 within 247s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.