Princes Bridge level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR WPH1).

predicted
OPEN
for 4 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 7 min · 3 min late

Next 30 min

OPEN 07:31–07:34 4m
CLOSED 07:34–07:40 6m
OPEN 07:40–07:48 8m
CLOSED 07:48–07:52 3m
OPEN 07:52–08:09 → 18m
Under the hood
Tue 06 Oct · 07:31
Today Tomorrow

Trains in window

07:27 🚆 2P92 Havant → London Waterloo Up (SW → NE) on time
07:38 🚆 2P22 Portsmouth & Southsea → London Waterloo Up (SW → NE) approaching
07:40 🚆 2P09 London Waterloo → Portsmouth Harbour Down (NE → SW) approaching
07:51 🚄 1P20 Portsmouth Harbour → London Waterloo Up (SW → NE) +2 min
🚄Express passenger 🚆Passenger
now 07:31:16 · 111 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,412 active · 31,721 delays · 1,702 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Princes Bridge crossing is predicted to be closed for about 6 h 12 min between 06:00 and 22:00, across roughly 77 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.6 min (06:39–06:45, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:33–07:33 in the morning and around 18:35–19:35 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Princes Bridge is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Haslemere–Petersfield line (Wessex route · ELR WPH1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 711 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Full accuracy report →

Is this right?