Sheet level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR WPH1).

predicted
CLOSED
for 2 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 2 min · on time

Next 30 min

CLOSED 07:07–07:09 2m
OPEN 07:09–07:14 4m
CLOSED 07:14–07:20 6m
OPEN 07:20–07:22 3m
CLOSED 07:22–07:26 3m
OPEN 07:26–07:31 5m
CLOSED 07:31–07:34 3m
OPEN 07:34–07:39 → 5m
Under the hood
Tue 06 Oct · 07:07
Today Tomorrow

Trains in window

07:04 🚆 2P90 Fareham → London Waterloo Up (SW → NE) passed
07:09 🚆 2P07 London Waterloo → Portsmouth Harbour Down (NE → SW) approaching
07:17 🚄 1P18 Portsmouth Harbour → London Waterloo Up (SW → NE) approaching
07:20 🚧 3S80 Effingham Jn. C.H.S. → Effingham Jn. C.H.S. Down (NE → SW) active
07:26 🚆 2P92 Havant → London Waterloo Up (SW → NE) active
07:34 🚆 2P22 Portsmouth & Southsea → London Waterloo Up (SW → NE) -1 min
🚄Express passenger 🚆Passenger 🚧Engineering
now 07:07:58 · 111 avg · 6 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,373 active · 31,690 delays · 1,693 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Sheet crossing is predicted to be closed for about 5 h 33 min between 06:00 and 22:00, across roughly 68 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.6 min (06:39–06:45, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:08–08:08 in the morning and around 15:45–16:45 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Sheet is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Haslemere–Havant line (Wessex route · ELR WPH1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 711 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.

Full accuracy report →

Is this right?