Rotherham Road level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR BEW).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 09:59–11:59+ 2h+
Under the hood
Thu 22 Oct · 09:59
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 09:59:41 · 24 avg · 0 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,962 cancelled · 9 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Rotherham Road crossing is predicted to be closed for about 32 min between 06:00 and 22:00, across roughly 7 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 8.8 min (06:00–06:09, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 20:25–21:25 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Rotherham Road in Beighton, South Yorkshire.

Rotherham Road is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Beighton Station Jn–Masborough F.D. line (North and East route · ELR BEW). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 68 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 91.4% of the warnings we could verify came true.

Typical timing error was ±6s (9 in 10 within 31s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?