CCTV-monitored manual barrier level crossing on the North and East route (ELR TJC2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:50 | π 2N06 | Leeds β Sheffield Up (E β W) | +2 min |
| 10:03 | π 1N07 | Sheffield β Leeds Down (W β E) | standing 24 min |
| 10:04 | π 1W42 | Sheffield β Scarborough Down (W β E) | active |
| 10:05 | π 2R17 | Adwick β Sheffield Up (E β W) | +4 min |
| 10:06 | π 1B71 | Cleethorpes β Liverpool Lime Street HL/ML Up (E β W) | +6 min |
| 10:10 | π 2Y87 | York β Sheffield Up (E β W) | +2 min |
| 10:13 | π 2R20 | Sheffield β Adwick Down (W β E) | active |
| 10:17 | π 1V85 | Newcastle β Reading Up (E β W) | +1 min |
| 10:21 | π 1N08 | Leeds β Sheffield Up (E β W) | active |
| 10:22 | π 1B70 | Liverpool Lime Street HL/ML β Cleethorpes Down (W β E) | +4 min |
| 10:23 | π 2N11 | Sheffield β Leeds Down (W β E) | active |
| 10:25 | π 1S37 | Plymouth β Edinburgh Down (W β E) | -1 min |
On todayβs timetable, Holmes Junction crossing is predicted to be closed for about 9 h 34 min between 06:00 and 22:00, across roughly 148 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 13.2 min (07:46–07:59, 6 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:32β08:32 in the morning and around 17:38β18:38 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Steel Street in Masbrough, South Yorkshire.
Holmes Junction is a CCTV-monitored manual barrier crossing (CCTV) on the SheffieldβParkgate line (North and East route · ELR TJC2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 1,674 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was Β±34s (9 in 10 within 136s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.