| 02:09 | 🚃 6M77 | Drax AES → Liverpool Biomass TML GBF Down (E → W) | +3 min |
On today’s timetable, Denaby crossing is predicted to be closed for about 7 h 36 min between 06:00 and 22:00, across roughly 93 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (23:57–00:00, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:11–08:11 in the morning and around 17:47–18:47 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Denaby is a cctv-monitored manual barrier crossing (CCTV) on the Belmont Down Yard–Swinton (S.Yorks) line (North and East route · ELR PED5). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,044 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 97.8% of the warnings we could verify came true.
Typical timing error was ±5s (9 in 10 within 51s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.