Automatic half-barrier level crossing on the Wessex route (ELR RSJ).
| No trains in the next 30 minutes. |
On today’s timetable, Tangley crossing is predicted to be closed for about 2 h 37 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 10:09–11:09 in the morning and around 16:06–17:06 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Tangley is a automatic half-barrier crossing (AHB) on the Reigate–Haslemere line (Wessex route · ELR RSJ). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 231 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 99.7% of the warnings we could verify came true.
Typical timing error was ±42s (9 in 10 within 88s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.