Milford level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wessex route (ELR WPH1).

predicted
OPEN
for at least 2h

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 02:50–04:50+ 2h+
Under the hood
Fri 13 Nov · 02:50
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 02:50:53 · 120 avg · 0 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-11-12..2026-11-14
fetched 02:08:19
trust 32,665 active · 30,830 delays · 2,096 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Milford crossing is predicted to be closed for about 6 h 56 min between 06:00 and 22:00, across roughly 77 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (23:57–00:01, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:49–07:49 in the morning and around 17:23–18:23 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Lane in Enton Green, Surrey, next to Milford station.

Milford is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Guildford–Haslemere line (Wessex route · ELR WPH1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 436 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 92.0% of the warnings we could verify came true.

Typical timing error was ±8s (9 in 10 within 31s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?